coursedetails.courseName

Course Description

  • Introduction & Importance
  • What is Quality Assurance Testing?
  • Code of Ethics for QA
  • Goals of QA Testing
  • Benefits of QA Testing
  • SME
  • Functional Requirements doc
  • Project Artifacts
  • Wire Frames
  • Activity diagrams
  • Primary flow
  • Alternate flow
  • Exceptional flow
  • Use Cases
  • Use Case narratives
  • Components of SDLC
  • SDLC - Requirements gathering
  • High level & Low level doc
  • BRD - Business Requirements doc
  • SDLC - Analysis
  • Functional requirements
  • Nonfunctional requirements
  • Business rules
  • Business Requirements vs Business Rules
  • SDLC ? Design
  • 4 Tier Architecture
  • SDLC - Coding
  • SDLC - Testing
  • SDLC Release-maintenance
  • Introduction
  • Fundamentals
  • Containers
  • Networking
  • Volumes
  • Files
  • 9 Phases Of STLC Testing
  • Functional
  • Non-Functional
  • Test Plan/strategy Document
  • Effort Estimation
  • Tool Selection
  • Effort Estimation
  • Resource Planning
  • Training requirements
  • How to generate scenarios
  • Test Cases ? how to write
  • Design sequence, priority, scripts
  • Review Test Cases
  • Create Test Data?
  • RTM ? Requirements Traceability Matrix
  • Understanding required Architecture
  • Test Bed setup
  • Test Data ? analyze, create
  • Smoke Test
  • Executing Tests
  • Test Result
  • Map defects in Requirement Traceability Matrix
  • Reporting - Defect reports ? how to report bugs
  • Tracking ? defect tracking, bug life cycle
  • Defect Distribution by type and Severity
  • Management reports
  • Test Closure report
  • Test Metrics
  • Creating Test cases
  • Severity
  • Priority
  • Test data
  • Pass-Fail
  • Expected value
  • Actual value
  • Test case status
  • Writing test cases
  • Debugging
  • Fix-upgrade
  • Bug-defect
  • SDLC Design
  • System Architecture 4 Tier
  • Front end
  • Thin client-fat client
  • Web server
  • Clustering
  • Redundancy
  • What is a server
  • Application Server
  • Database
  • What is a database
  • Testing DB
  • Lead Developer
  • Lead QA
  • Master Test plan
  • Test Coverage
  • How to test Field level
  • How to test Form level
  • How to test Workflow level
  • Naming convention
  • Entry Criteria
  • Exit Criteria
  • SDLC Coding
  • Unit testing
  • Integration testing
  • System integration testing
  • System Testing
  • What is a ?Build?
  • Recap flow of test cases
  • Informal-Formal review
  • Self-review
  • Peer review
  • Walk-thru
  • Inspection
  • Waterfall
  • Spiral
  • RAD
  • V-model
  • Agile ? detailed understanding of terminology, processes in Agile
  • Black box testing
  • White box testing
  • Grey box testing
  • Unit Testing
  • Integration Testing
  • System testing
  • Black Box Testing
  • White Box Testing
  • User Acceptance testing (UAT)
  • Pre-Production & Production Testing
  • Non-functional testing
  • Usability testing
  • Performance testing
  • Scalability testing
  • Compatibility testing
  • Reliability testing
  • Load testing
  • Volume testing
  • Security testing
  • Maintenance testing
  • Functional testing
  • Smoke
  • Regression testing
  • Re-testing testing
  • Regression testing vs re-testing
  • Installation testing
  • Uninstall testing
  • Beta testing
  • Alpha testing
  • Ad-hoc testing
  • Exploratory testing
  • Accessibility Testing
  • DB testing
  • Experience based testing
  • Usability testing
  • End to end testing
  • UAT - User Acceptance Testing
  • Monkey testing
  • Cloud computing
  • Mobile Testing
  • Web Services
  • Data Warehouse
  • ETL
  • Unix
  • Quality Center
  • Rally/ Jira
  • SOAP UI
  • UNIX commands
  • UNIX and PUTTY/UBUNTU
  • Shell scripting running
  • Log checking
  • Form
  • Field
  • Record
  • Primary key
  • Foreign Key
  • RDBMS
  • SQL commands
  • Select
  • Where
  • Operators
  • Filter
  • Sort
  • Insert
  • Update
  • Delete

SQL

  • DBMS & RDBMS
  • SQL Queries
  • Joins
  • Views, Triggers, Stored Procedures
  • SQL & TOAD with Oracle.
  • Advanced SQL
  • Joining multiple tables
  • Live Project
  • Assignments
  • Domain knowledge at the end
  • Healthcare
  • Telecom
  • Banking
  • Airline
  • Salesforce
  • Mock interviews
  • Sample Interview questions
Answer

Yes, Sterling IT Training is registered with the State of Texas, with offices in the greater Dallas area.

Answer

With an average of over 15 years of experience working in IT, all our trainers are highly qualified, and bring real-world IT experience to their training, combining expertise with a talent for teaching.

Answer

You can watch a recording of the session you missed, and also, if you wish, re-attend that session in the next batch - usually in the following month.

Answer

Yes, at the start of each course we offer an Introduction session (demo) which tells you details about course content (syllabus) and also enables you to get a sense of the training style and method.

Answer

Yes, we offer both online as well as in-class training.

Answer

Although Sterling doesn’t have a job placement department, we’ll put you in touch with affiliate companies who offer job placement assistance in the following ways:

  • Resume preparation
  • Mock interviews
  • Interview questions
  • Identifying job openings
  • Job applications, and setting up interviews
  • On the job support during initial period
Answer

Yes, we will consider accommodating your request for split payments.

Answer

Please click Contact Now , fill in the info, and let us know. We'll begin the registration process, and confirm to you dates, times of classes, and other info.

Or send us an e-mail: contact@sterlingtrainingcenter.com

Or call: (214) 872 6077
9am-5pm Eastern Time

Answer

Please click Contact Now , fill in the info, and let us know. We'll begin the registration process, and confirm to you dates, times of classes, and other info.

Or send us an e-mail: contact@sterlingtrainingcenter.com

Or call: (214) 872 6077
9am-5pm Eastern Time